Jericho Wind Energy Centre

Development on the Jericho Wind Energy Centre began in 2006. The wind farm is located in Lambton County with electrical interconnection extending into North Middlesex.This wind energy project has a maximum generating capacity of 150 megawatts.  At the maximum generating capacity, the Jericho Wind Energy Centre will produce enough energy for approximately 37,500 average homes in Ontario. This project has been awarded a Feed-in-Tariff contract by the Ontario Power Authority as well as received the Renewable Energy Approval from the Ministry of the Environment. This project is now operational.

Widgets Tabs

 
 

Accordion

Renewable Energy Approval

Project Modification - October 2014

Project Modification - August 2014

REA Revision Reports

Draft REA Revision Reports, September 2013

Community Newsletters

Ontario Energy Board - Documents

Generation Licence Application

Notice of Application and Hearing

Section 41(9) Application

Jericho Wind, Inc. has applied to the Ontario Energy Board under section 41(9) of the Electricity Act, 1998 for a determination of the location of its distribution facilities within certain road allowances owned by Lambton County. According to the Ontario Energy Board:

The scope of this proceeding is limited to determining the location of the Distribution System within road allowances owned by Lambton County. The consideration of any other aspect of the Project is not within the Board's jurisdiction.
A copy of Jericho Wind, Inc.'s Application and Pre-Filed Evidence is located here:

 

Application and Pre-Filed Evidence, Part 1

Application and Pre-Filed Evidence, Part 2

Application and Pre-Filed Evidence, Part 3

Application and Pre-Filed Evidence, Part 4

On April 3, 2014, Jericho Wind, Inc. filed an administrative correction to the Pre-Filed Evidence, which corrects an overview map included therein. A copy of the corrected map and the Board's acceptance of same are located here:

Correction to Pre-Filed Evidence Letter

Acceptance to Correction to Pre-Filed Evidence Letter

Leave to Construct Application

Jericho Wind, Inc. has applied to the Ontario Energy Board for leave to construct transmission facilities that will enable the Jericho Wind Energy Centre to connect to the Ontario power system. Copies of the Notice of Application and Hearing, as well as the Application for Leave to Construct can be found at:

Application for Leave to Construct Transmission Facilities

Notice of Application and Hearing

Jericho Wind, Inc. is a co-owner of proposed shared transmission facilities that are the subject of a current application before the Ontario Energy Board. The hearing process concluded on October 18, 2013 and the decision of the Ontario Energy Board was issued on November 12, 2013. The Decision and Order along with Application documents can be found at:

Decision and Order of the Ontario Energy Board granting Leave to Construct Transmission Facilities

Bornish Wind, LP, Kerwood Wind, Inc. and Jericho Wind, Inc. - Application for Leave to Construct Transmission Facilities

Notice of Application and Hearing

Site Plan Report, November 2012

Shadow Flicker Assessment

Community Liaison Committee

Archaeological Reports

Construction Plan Report

Consultation Report

Decommissioning Report

Design and Operations Report

Heritage Assessment Report

Natural Heritage Assessment Report

MNR Confirmation Letter

MNR Reconfirmation Letter 1

MNR Reconfirmation Letter 2

Natural Heritage Assessment Report Part 1

Natural Heritage Assessment Report Part 2

Natural Heritage Assessment Report Part 3

Natural Heritage Assessment Report - Appendices, Part 1

Natural Heritage Assessment Report - Appendices, Part 2

Natural Heritage Assessment Report - Appendices, Part 3

Natural Heritage Assessment Report - Appendices, Part 4

Natural Heritage Assessment Report - Appendices, Part 5

Natural Heritage Assessment Report - Appendix C

Natural Heritage Assessment Report - Appendix D1 Part 1

Natural Heritage Assessment Report - Appendix D1 Part 2

Natural Heritage Assessment Report - Appendix D1 Part 3

Natural Heritage Assessment Report - Appendix D1 Part 4

Natural Heritage Assessment Report - Appendix D1 Part 5

Natural Heritage Assessment Report - Appendix D1 Part 6

Natural Heritage Assessment Report - Appendix D1 Part 7

Natural Heritage Assessment Report - Appendix D1 Part 8

Natural Heritage Assessment Report - Appendix D1 Part 9

Natural Heritage Assessment Report - Appendix D1 Part 10

Natural Heritage Assessment Report - Appendix D1 Part 11

Natural Heritage Assessment Report - Appendix D1 Part 12

Natural Heritage Assessment Report - Appendix D1 Part 13

Natural Heritage Assessment Report - Appendix D1 Part 14

Natural Heritage Assessment Report - Appendix D1 Part 15

Natural Heritage Assessment Report - Appendix D1 Part 16

Natural Heritage Assessment Report - Appendix D1 Part 17

Natural Heritage Assessment Report - Appendix D1 Part 18

Natural Heritage Assessment Report - Appendix D1 Part 19

Natural Heritage Assessment Report - Appendix D1 Part 20

Natural Heritage Assessment Report - Appendix D1 Part 21

Natural Heritage Assessment Report - Appendix D1 Part 22

Natural Heritage Assessment Report - Appendix D1 Part 23

Natural Heritage Assessment Report - Appendix D1 Part 24

Natural Heritage Assessment Report - Appendix D1 Part 25

Natural Heritage Assessment Report - Appendix D1 Part 26

Natural Heritage Assessment Report - Appendix D1 Part 27

Natural Heritage Assessment Report - Appendix D1 Part 28

Natural Heritage Assessment Report - Appendix D1 Part 29

Natural Heritage Assessment Report - Appendix D1 Part 30

Natural Heritage Assessment Report - Appendix D1 Part 31

Natural Heritage Assessment Report - Appendix D1 Part 32

Natural Heritage Assessment Report - Appendix D1 Part 33

Natural Heritage Assessment Report - Appendix D1 Part 34

Natural Heritage Assessment Report - Appendix D1 Part 35

Natural Heritage Assessment Report - Appendix D1 Part 36

Natural Heritage Assessment Report - Appendix D1 Part 37

Natural Heritage Assessment Report - Appendix D1 Part 38

Natural Heritage Assessment Report - Appendix D1 Part 39

Natural Heritage Assessment Report - Addendum 1 Part 1

Natural Heritage Assessment Report - Addendum 1 Part 2

Natural Heritage Assessment Report - Addendum 1 Part 3

Natural Heritage Assessment Report - Addendum 2

Project Description Report

Project Modifications Report

Water Assessment Report

Water Assessment and Water Body Report

Wind Turbine Specification Report

Bird and Bat Monitoring

Wildlife Behaviour Fact Sheet

Project Modifications 2017

 
 
 
 
Jerhico project map

Contact Information For more information, please send inquiries to: jericho.wind@nexteraenergy.com
or call 1-877-257-7330.